Skip to content
SOKANTARAHVAC • MEP • BIM

Daikin · Error Codes · Aceh Tamiang

Daikin Floor Standing E4 Error and MCB Tripping: A Case Study

By Khairul Rizalyansyah, Technical Manager — Published — 5 min read

Technician in a blue helmet measuring refrigerant pressure with a manifold gauge at an AC outdoor unit

A Daikin floor-standing air conditioner at a facility in Kuala Simpang, Aceh Tamiang, showed error code E4. Every time it ran in cool mode, its current rose until the breaker (MCB) tripped. The SOKANTARA team handled the case in November 2026.

This article is for facility managers and building technicians who run floor-standing units. It covers what E4 means, why it can appear together with a tripping breaker, and the order of checks we use. We do not name the owner.

The short answer: on Daikin units, E4 usually means low-pressure protection has tripped. When high current comes with it, check the power supply first, then the evaporator and condenser. In this case the unit returned to normal after both coils were cleaned.

What does the E4 error mean on a Daikin AC?

E4 usually means low-pressure protection has tripped. Daikin Philippines' official error code search lists E4 as a low-pressure switch fault, with possible causes being a faulty switch, poor connector contact, a broken wire or a faulty outdoor PCB.

Low pressure itself has several causes. A refrigerant shortage, a stop valve that is not fully open and restricted airflow across the evaporator all pull suction pressure down.

The meaning can vary slightly between Daikin series. On VRV systems, E4 also means low pressure, as explained in our Daikin VRV error code list. For a floor-standing unit, confirm the meaning and thresholds in the service manual for your model.

Why can E4 appear together with a tripping breaker?

Because both symptoms can come from two dirty coils. A dirty evaporator lowers suction pressure, while a dirty condenser raises discharge pressure and compressor current.

An evaporator covered in dust absorbs less heat from the room air. The refrigerant inside does not evaporate fully, suction pressure drops, and low-pressure protection can trip.

On the outdoor side, a dirty condenser cannot reject heat well. Discharge pressure climbs, the compressor works harder and its current rises. Once current exceeds the breaker rating, the breaker trips.

We did not measure pressure and current before and after cleaning. The explanation above is inferred from the symptoms and the fix.

Symptom Likely cause First check
E4 appears, unit stops Low suction pressure, refrigerant shortage, stop valve partly closed Measure suction pressure, check stop valves
E4 appears, room not cool enough Dirty evaporator or filter, weak indoor fan Check coil and filter condition, blower speed
Breaker trips in cool mode High compressor current, dirty condenser, low voltage Measure voltage and current, inspect condenser coil
Breaker also trips in fan mode Fan motor, cabling or breaker fault Check cable insulation and breaker condition
E4 clears after a rest, then returns Recurring pressure or sensor problem Log when it appears, check sensor and connectors

How do you check an E4 error with a tripping breaker?

Start with the electrical side, because it is quick and safe to check. Then move to airflow, then refrigerant. The order we use:

  1. Record the symptoms. The code shown, the mode when the breaker trips, and whether it trips at once or after a few minutes.
  2. Check the power supply. Voltage at the unit terminals, breaker condition and rating, and any loose or hot connections.
  3. Check the indoor side. Filter and evaporator coil condition, blower rotation, and the condensate drain.
  4. Check the outdoor side. Condenser coil condition, fan rotation, and clearance around the unit so hot air is not drawn back in.
  5. Measure the refrigerant side if symptoms remain. Suction and discharge pressure and stop valve positions. Follow the manufacturer's manual and refrigerant safety rules.
  6. Check sensors, connectors and the PCB. If pressures are normal but E4 persists, suspect the low-pressure switch, its wiring or the outdoor PCB.

This order avoids work that may not be needed, such as adding refrigerant or replacing a compressor before the basics are checked.

What happened in Kuala Simpang?

The unit was a Daikin FVN30AV1L floor-standing AC with an RN28CV1P outdoor unit. It showed E4, and its current rose until the breaker tripped whenever it ran in cool mode.

The team checked the power supply first and found it normal. With the electrical side ruled out, they moved to airflow and cleaned the condenser and evaporator.

After cleaning, the unit ran normally in cool mode again. The E4 code did not return and the breaker no longer tripped.

Dirty coils often cause error codes like this one, especially on units that are rarely serviced or sit in dusty surroundings.

How do you stop E4 from coming back?

Service the unit on a written schedule. The exact interval follows the manufacturer's manual and the unit's surroundings.

Good scheduled service covers cleaning the filter, evaporator and condenser, checking fan rotation, measuring voltage and current, and measuring refrigerant pressure. Record the results of each visit, so a drop in performance shows before the unit stops. For buildings with many units, our guide to office AC maintenance terms of reference helps define the service scope.

Conclusion

On Daikin air conditioners, E4 usually means low-pressure protection has tripped. When it comes with a tripping breaker, check the power supply first, then the evaporator and condenser, then the refrigerant side and sensors. For the floor-standing unit in Kuala Simpang, cleaning both coils was enough to bring it back to normal.

SOKANTARA is an HVAC and MEP contractor headquartered in Medan, serving projects across Indonesia, including Aceh. We handle HVAC and refrigeration, including repairs and scheduled service for building air conditioning. Contact our team if your unit shows an error code.

References

Sources cited in this article:

Frequently asked questions

What does the E4 error mean on a Daikin AC?

The E4 error on a Daikin AC usually means low-pressure protection has tripped: suction pressure dropped below its limit or the low-pressure switch opened. The exact meaning can vary by series, so confirm it in your unit's service manual.

Why does a Daikin AC trip the breaker in cool mode?

A breaker that trips in cool mode usually means the compressor is drawing too much current. Common causes are a dirty condenser that raises discharge pressure, unstable voltage, or a failing capacitor or compressor.

Does an E4 error always mean low refrigerant?

No. An E4 error can also come from a dirty evaporator or filter that lowers suction pressure, a stop valve that is not fully open, or a faulty sensor or cable. Adding refrigerant without measuring pressure can make things worse.

Start a conversation

Discuss this article with our team

Send drawings, floor plans or simply an outline of your needs. Our engineering team will review and get back to you.