
- Home
- Services
Services
Four services, one team.
We handle HVAC, VRV/VRF, MEP and BIM in-house, and everyone works from the same model.
01
HVAC Contractor in Medan
HVAC contractor in Medan for building system design, installation and maintenance. BIM/Revit coordination, VRV/VRF and MEP support for projects across Indonesia.
- Cooling load calculation
- Split, cassette, ducted & chiller
- Ductwork, grilles & diffusers
- Scheduled maintenance
02
VRV / VRF Systems
Design, Revit modelling, installation and commissioning of multi-zone VRV/VRF systems for offices, campuses and government buildings across Indonesia.
- System design & unit selection
- Refrigerant piping & refnets
- Centralised control
- Commissioning & performance tests
03
MEP Contractor in Medan
MEP contractor for building projects in Medan and across Indonesia. Mechanical, supporting electrical and plumbing work is coordinated in BIM before installation.
- Mechanical & ventilation
- Plumbing & drainage
- Supporting electrical
- Cross-discipline coordination
04
MEP BIM (Revit)
MEP BIM modelling and coordination in Autodesk Revit, including clash detection, shop drawings, BOQ and as-built models, for projects across Indonesia.
- Revit model per discipline
- Clash detection
- Shop drawings & BOQ
- As-built model

Start a conversation
Tell us about your project. We'll reply with a plan.
Send drawings, floor plans or simply an outline of your needs. Our engineering team will review and get back to you.




