Skip to content
SOKANTARAHVAC • MEP • BIM

Projects

Clients and site documentation.

Selected clients and documentation of our team's work. Full project details are available for vendor evaluation and tender documents.

Clients

  • Pemerintah Kota MedanPemerintah Kota Medan
  • Pemerintah Kabupaten Deli SerdangPemerintah Kabupaten Deli Serdang
  • Universitas Negeri MedanUniversitas Negeri Medan

Government institutions and universities we have worked for.

Project documentation

Photos and video straight from SOKANTARA job sites.

01

Sei Mangkei, Simalungun Regency

VRV system commissioning

Refrigerant pressure checks, control wiring and operational tests of VRV outdoor units before handover, carried out under full HSE procedures.

6 photos

  • Technician checking VRV refrigerant pressure with a manifold gauge
    Technician checking VRV refrigerant pressure with a manifold gauge
  • Two technicians checking a VRV outdoor unit control panel on the roof
    Two technicians checking a VRV outdoor unit control panel on the roof
  • Technicians in hard hats and safety vests at the outdoor unit area
    Technicians in hard hats and safety vests at the outdoor unit area
  • Engineer and technicians checking air-conditioning control wiring
    Engineer and technicians checking air-conditioning control wiring
  • Team inspecting outdoor units with a checklist
    Team inspecting outdoor units with a checklist
  • Technician installing an outdoor unit beside a building
    Technician installing an outdoor unit beside a building

02

Commercial building, Medan Baru

VRV, cassette & ductwork installation

Work from roof to ceiling: Daikin VRV outdoor units, refrigerant pipe routes, brazing, cassette indoor units and air-distribution ductwork.

9 photos

  • Daikin VRV outdoor units and refrigerant piping on a building roof
    Daikin VRV outdoor units and refrigerant piping on a building roof
  • Technicians installing a Daikin VRV outdoor unit on the roof
    Technicians installing a Daikin VRV outdoor unit on the roof
  • Two technicians installing a ceiling cassette indoor unit
    Two technicians installing a ceiling cassette indoor unit
  • Cassette indoor unit installation from scaffolding in an open ceiling
    Cassette indoor unit installation from scaffolding in an open ceiling
  • Technician in a hard hat joining insulated copper pipe
    Technician in a hard hat joining insulated copper pipe
  • Copper pipe coils prepared for installation
    Copper pipe coils prepared for installation
  • Technicians installing ductwork in a building ceiling
    Technicians installing ductwork in a building ceiling
  • Ductwork and diffusers under the roof of a large hall
    Ductwork and diffusers under the roof of a large hall
  • Technician routing refrigerant and drain pipes on the roof
    Technician routing refrigerant and drain pipes on the roof

03

Building plant room

AHU & DX unit inspection

Pre-commissioning inspection of a row of DX AHUs and outdoor units: checklist records, connection checks and operational readiness.

4 photos

  • Row of DX AHUs in a plant room with ductwork overhead
    Row of DX AHUs in a plant room with ductwork overhead
  • Technician recording an inspection checklist in front of the AHUs
    Technician recording an inspection checklist in front of the AHUs
  • Row of DX AHUs with service access doors
    Row of DX AHUs with service access doors
  • DX outdoor unit with service panel open
    DX outdoor unit with service panel open
  • AHU inspection walkthrough

04

Various sites

Survey, fabrication & mobilisation

Site surveys with the project team, fabrication of unit support frames, and crane lifting of outdoor units.

3 photos

  • Survey team reviewing a project site in a building under construction
    Survey team reviewing a project site in a building under construction
  • Fabricated steel support frame for outdoor units in the workshop
    Fabricated steel support frame for outdoor units in the workshop
  • Crane lifting an air-conditioning unit onto a building roof
    Crane lifting an air-conditioning unit onto a building roof

Need our work-experience list?

We prepare experience lists, references and supporting documents for your procurement requirements.

Request documents

Start a conversation

Tell us about your project. We'll reply with a plan.

Send drawings, floor plans or simply an outline of your needs. Our engineering team will review and get back to you.