Skip to content
SOKANTARAHVAC • MEP • BIM
SOKANTARA technician inspecting VRV units in a commercial building plant room

HVAC · MEP Contractor · BIM Specialist

Precision HVAC & MEP,modelled before it's built.

We design, coordinate in BIM, and install air-conditioning, VRV/VRF and MEP systems for building owners, consultants and main contractors who don't accept compromise.

Since 2015

Trusted by

Institutions that demand rigour.

  • Pemerintah Kota MedanPemerintah Kota Medan
  • Pemerintah Kabupaten Deli SerdangPemerintah Kabupaten Deli Serdang
  • Universitas Negeri MedanUniversitas Negeri Medan

About SOKANTARA

We work behind the walls, so all you notice is comfort.

Since 2015, SOKANTARA has delivered HVAC and MEP systems from drawing to handover. Every pipe run, duct and cable tray is coordinated in a 3D model before material is ordered — so clashes are found on screen, not on site.

See how we work
Years of practice
11+
Integrated disciplines
04
Institutional clients
03

Our difference

Every system is built twice. First in Revit.

A coordinated MEP model detects clashes across disciplines, produces accurate shop drawings and BOQs, and leaves owners with as-built documentation they can rely on for years.

  • 01Clash detection across HVAC, plumbing, electrical and structure before construction
  • 02Shop drawings, sections and details generated from the model
  • 03Material quantities (BOQ) traceable to the model
  • 04As-built model for operations and maintenance
Explore BIM services
Layered 3D MEP coordination model showing duct and pipe routes

Process

A calm, measured method.

  1. 01

    Survey & Brief

    Site conditions, load requirements and architectural constraints recorded before a single line is drawn.

  2. 02

    Design & BIM Model

    Load calculation, system selection and a Revit model coordinated across disciplines.

  3. 03

    BOQ & Proposal

    Quantities from the model, clear specifications, a proposal you can compare fairly.

  4. 04

    Installation

    Field teams build from clash-free shop drawings, with daily quality control.

  5. 05

    Commissioning & Care

    Performance testing, as-built handover, then a scheduled maintenance contract.

From the field

Real work, not promises.

Recent documentation from our team: VRV and cassette installation, AHU inspection and on-site commissioning.

View all projects
  • Daikin VRV outdoor units and refrigerant piping on a commercial building roof in Medan
    Rooftop VRV installation — Medan
  • SOKANTARA technician checking VRV refrigerant pressure with a manifold gauge
    VRV commissioning — Sei Mangkei
  • Two technicians installing a ceiling cassette indoor unit
    Cassette indoor unit installation
  • Row of DX air-handling units in a plant room before commissioning
    DX AHU inspection

References

A reputation built project by project.

We serve local government institutions and universities that require complete documentation and procedural compliance. Reference letters and our work-experience list are available for tenders and vendor evaluation.

Request reference documents

Frequently asked

What procurement teams usually ask.

Does SOKANTARA handle government projects and tenders?

Yes. We have served local government institutions and universities, and can prepare technical proposals, BOQs and shop drawings in tender format.

Can BIM be ordered separately from installation?

Yes. We provide MEP BIM modelling and coordination in Revit for consultants, main contractors and owners, without requiring an installation package.

Which areas do you serve?

Our head office is in Medan, North Sumatra, and we serve projects across Indonesia. MEP BIM work can be delivered remotely for any city; for installation outside North Sumatra we plan team mobilisation according to project scope.

What about warranty and maintenance?

Workmanship warranty terms and scheduled maintenance contracts are agreed per project and stated clearly in the proposal.

What do you need to prepare a quote?

Architectural drawings or floor plans, room functions, project location and target timeline. If drawings are incomplete, we can start with a site survey.

Start a conversation

Tell us about your project. We'll reply with a plan.

Send drawings, floor plans or simply an outline of your needs. Our engineering team will review and get back to you.