SOKANTARA is an HVAC contractor in Medan for building owners, facility managers, consultants and main contractors who need coordinated air-conditioning design and installation. We serve projects in Medan and North Sumatra, and can discuss mobilisation for projects elsewhere in Indonesia.
Our HVAC work in Medan runs from the cooling-load review to testing before handover. We also coordinate in BIM/Revit, so duct routes, piping and service access are checked before anything is installed.
HVAC planning and installation
Comfort depends on decisions made early in the project. Capacity has to match the actual load, air has to reach every part of the room, and pipes have to run where technicians can reach them later.
Scope
- Load calculation based on room function, building orientation and occupancy.
- System selection (split, cassette, ducted or central), compared on life-cycle cost as well as purchase price.
- Installation of refrigerant piping, drainage, ductwork, grilles and diffusers to the shop drawings.
- Pressure, vacuum and performance tests before handover.
- Scheduled maintenance, with a written condition report for each unit.
Who it is for
Building owners, facility managers and project teams planning air-conditioning systems for commercial, education or government buildings. SOKANTARA's project documentation includes VRV, cassette and ductwork installation in Medan Baru, as well as AHU inspection and commissioning.





